top of page

Building Technology 1

PROJECT 1 

Industrialized Building System

 In a group of 6, we are required to design a 3-storey apartment block using mainly IBS components. Later on, we need to construct a physical model of the building to imitate the actual IBS construction process and to record all the process in a video.

PROJECT 2 

Construction Solutions

This assignment is aligned with the Studio Design Project (Sem 5) and aims to facilitate students in the technical studies and development of their design. It deals with the analysis and establishment of the structural and the envelope systems of the students' design to ensure that the design has logical and workable construction systems. It also encourages students to think about construction as integral part of the design and not just an afterthought.  

© 2017 by JUYI TANG. Proudly created with Wix.com

  • Twitter Square
  • facebook-square
bottom of page